Project Details
Location: THIVA GREECE
Power Plant Capacity: 435 MW
End Customer: HERON THEMROELECTRIC S.A.
EPC Contractor: TERNA
HRSG Boiler Manufacturer: DOOSAN
Gas Turbine Manufacturer: GENERAL ELECTRIC
Start: 2008
Finish: 2009
Category: ERECTION OF BOILER/ PREFABRICATION AND ERECTION OF BOP PIPING/ERECTION OF GAS TURBINE
Scope of Works
- Complete mechanical Erection works of HRSG Boiler including HRSG Piping and stack
- Erection of Gas turbine single shaft 9FB Gas Turbine
- Erection of gas turbine piping (alloy, SS and CS)
- Prefabrication and Erection of BOP Piping (alloy, SS and CS)
- Erection of BOPE Equipment