Project Details

Location: RHODES ISLAND GREECE
Power Plant Capacity: 115 MW
End Customer: P.P.C. S.A.
EPC Contractor: TERNA
Diesel Engine Generatin Set Manufacturer: WARTSILA
Start: 2016
Finish: On going
Category: ERECTION AND ALIGNMENT OF GENERATING SET/ ERECTION OF BOP PIPING, AIR INTAKE PIPELINES AND FIN FAN COOLERS

 

Scope of Works

  • Installation and final alignment of the 7 diesel trains in their final position
  • Erection of BOP piping including supports
  • Erection of the Fin Fan Coolers – (28 units, one unit consists of 7 exchangers) including the metal structure and the auxiliary systems on the roof of the machine room
  • Erection of the access platforms of diesel engines in the engine area and the Air Intake Pipelines of Generating Sets

 