Project Details
Location: Sidirokastron terminal in North GREECE
Owner: DESFA
Client: TERNSA S.A.
Start: SEPTEMBER 2013
Finish: DECEMBER 2013
Category: PREFABRICATION AND ERECTION OF NATURAL GAS BY PASS PIPELINE
Scope of Works
- Prefabrication and erection of above ground steel pipe Gas (pipes 30″, by pass 2″), Installation of special items (insulating joints, instruments, etc.) Installation of fittings flanged parts (valves 30″ / 2″ pads).
- Cleaning, testing (hydraulic and pneumatic test with nitrogen), drying with nitrogen and final restoration of networks
- Supply, prefabrication, painting and installation of supports of above ground networks and access platforms. Sandblasting and painting of above ground networks including supply of paint materials and consumables
- Connecting the new with the existing network (tie in flanged and welded)