Project Details

Location: MEGALOPOLIS GREECE
Power Plant Capacity: 826 MW
End Customer: P.P.C. S.A.
EPC Contractor: TERNA
HRSG BOILER MANUFACTURER: NEM
Start: 2011
Finish: On going
Category: ERECTION OF BOILER / PREFABRICATION &ERECTION OF BOP PIPING AND ERECTION OF BOPE EQUIPMENT

 

Scope of Works

  • Complete mechanical Erection works of HRSG Boilers including HRSG Piping, Exhaust bypass systems and stacks. Total weight for erection 7800.000kg(7800 tons) Pressure Parts 3300 tons and 4500 tons Non pressure Parts. External Piping total weight (alloy, SS and CS) approx. 520.0000kg (520 tons), 28000 inch. Total exhaust bypass system 1020 ton
  • Prefabrication and Erection of BOP Piping including supports
  • Erection of BOPE Equipment
  • Prefabrication and Erection of Natural Gas pipe line system
  • Prefabrication and Erection of Gas Storage &Distribution and Plant Drains Systems
  • Prefabrication and Erection of AUXILIARY STEAM, HEATING SYSTEM, CIRCULATING WATER and OPEN COOLING WATER systems
  • Complete mechanical Erection works for an auxiliary boiler of superheated steam and all the auxiliary systems

 