Project Details

Location: ALIVERI GREECE
Power Plant Capacity: 425 MW
End Customer: P.P.C. S.A.
EPC Contractor: METKA
HRSG BOILER MANUFACTURER: ALSTOM
GAS TURBINE MANUFACTURER: ALSTOM
Start: 2010
Finish: 2011
Category: ERECTION OF BOILER /ERECTION OF BOP PIPING AND BOPE EQUIPMENT/ERECTION OF GAS TURBINE

 

Scope of Works

  • Complete mechanical Erection works of HRSG Boiler including HRSG Piping and stack. Total weight for Boiler erection 2.100.000kg (2.100 tons) Boiler Piping total weight (alloy, SS and CS) approx. 13500 inches
  • Erection of Gas turbine single shaft ALSTOM SSPT KA26B2.2 ICC
  • Erection of gas turbine piping (alloy, SS and CS) approx. 2300 inches
  • Erection of BOP Piping (alloy, SS and CS) approx. 30000 inch welding joints 3500 inch threading joints
  • Erection of BOPE Equipment

 

Project Photos