Projects

“VIER is able to carry out sophisticated erection thermal power plant projects which meet the most demanding industry standards.”

MINOS CSP PILOT PROJECT, GREECE

MINOS CSP PILOT PROJECT, GREECE

Project Details Location: Atherinolakos area, Lassithi, Crete, GreecePower Plant Capacity: End Customer: NUR-EnergieEPC Contractor: PRENECON S.AStart: 2019Finish: February 2020Category: Mechanical Erection & Commissioning of Concentrated Solar Power Tower and...

204 MW SOLAR PARK PROJECT, GREECE

204 MW SOLAR PARK PROJECT, GREECE

Project Details Location: Kozani, GreecePower Plant Capacity: 204 MWEnd Customer: Hellenic Petroleum GroupEPC Contractor: JUWI HELLASStart: December 2020Finish: On goingCategory: Mechanical Erection works Scope of Works Complete mechanical erection works of 204MW. In...

UNIT V 660MWEL OF SES PTOLEMAIS POWER PLANT

UNIT V 660MWEL OF SES PTOLEMAIS POWER PLANT

Project Details Location: PTOLEMAIS GREECE Power Plant Capacity: 660 MW End Customer: P.P.C. S.A. EPC Contractor: TERNA Turbine Manufacturer: MITSUBISHI HITACHI POWER SYSTEMS MHPSE Start: 2018 Finish: On going Category: ERECTION OF STEAM TURBINE/GENERATOR,TURBINE...

UNIT V 660MWEL OF SES PTOLEMAIS  POWER PLANT

UNIT V 660MWEL OF SES PTOLEMAIS POWER PLANT

Project Details Location: PTOLEMAIS GREECE Power Plant Capacity: 660 MW End Customer: P.P.C. S.A. EPC Contractor: TERNA Turbine Manufacturer: MITSUBISHI HITACHI POWER SYSTEMS MHPSE Start: 2017 Finish: On going Category: ERECTION OF BOILER PRESSURE PARTS   Scope...

South of Rhodes island POWER PLANT

South of Rhodes island POWER PLANT

Project Details Location: RHODES ISLAND GREECE Power Plant Capacity: 115 MW End Customer: P.P.C. S.A. EPC Contractor: TERNA Diesel Engine Generatin Set Manufacturer: WARTSILA Start: 2016 Finish: On going Category: ERECTION AND ALIGNMENT OF GENERATING SET/ ERECTION OF...

SAMRA-JORDAN COMBINED CYCLE GAS FIRE POWER PLANT Phase III ADD-ON

SAMRA-JORDAN COMBINED CYCLE GAS FIRE POWER PLANT Phase III ADD-ON

Project Details Location: ZARQA JORDAN Power Plant Capacity: 435 MW End Customer: SAMRA ELECTRIC POWER COMPANY EPC Contractor: METKA S.A. Start: MARCH 2014 Finish: FEBRUARY 2015 Category: PREFABRICATION AND ERECTION OF BOP PIPING   Scope of Works Prefabrication...

NATURAL GAS PIPELINE Transmission System

NATURAL GAS PIPELINE Transmission System

Project Details Location: Sidirokastron terminal in North GREECE Owner: DESFA Client: TERNSA S.A. Start: SEPTEMBER 2013 Finish: DECEMBER 2013 Category: PREFABRICATION AND ERECTION OF NATURAL GAS BY PASS PIPELINE   Scope of Works Prefabrication and erection of...

MEGALOPOLIS COMBINED CYCLE GAS FIRE POWER PLANT

MEGALOPOLIS COMBINED CYCLE GAS FIRE POWER PLANT

Project Details Location: MEGALOPOLIS GREECE Power Plant Capacity: 826 MW End Customer: P.P.C. S.A. EPC Contractor: TERNA HRSG BOILER MANUFACTURER: NEM Start: 2011 Finish: On going Category: ERECTION OF BOILER / PREFABRICATION &ERECTION OF BOP PIPING AND ERECTION OF...

SES KARDIA LIGNITE FIRE POWER PLANT

SES KARDIA LIGNITE FIRE POWER PLANT

Project Details Location: KOZANI GREECE Power Plant Capacity: 1200 MW Owner: P.P.C. S.A. Client: P.P.C. S.A. Start: 2011 Finish: 2012 Category: PREFABRICATION AND ERECTION OF 120 NEW SERPENTINES UnitIII (300MW)   Scope of Works Dismantling of the existing and...

ALIVERI COMBINED CYCLE GAS FIRE POWER PLANT

ALIVERI COMBINED CYCLE GAS FIRE POWER PLANT

Project Details Location: ALIVERI GREECE Power Plant Capacity: 425 MW End Customer: P.P.C. S.A. EPC Contractor: METKA HRSG BOILER MANUFACTURER: ALSTOM GAS TURBINE MANUFACTURER: ALSTOM Start: 2010 Finish: 2011 Category: ERECTION OF BOILER /ERECTION OF BOP PIPING AND...

ALOUMINIO COMBINED CYCLE GAS FIRE POWER PLANT UNIT II

ALOUMINIO COMBINED CYCLE GAS FIRE POWER PLANT UNIT II

Project Details Location: DISTOMO/AGIOS NIKOLAOS GREECE Power Plant Capacity: 444 MW UNIT II End Customer: MYTILINEOS S.A. GROUP EPC Contractor: METKA POWER TRAIN MANUFACTURER: GENERAL ELECTRIC Start: 2009 Finish: 2010 Category: ERECTION OF STEAM TURBINE/GAS TURBINE &...

THISVI COMBINED CYCLE GAS FIRE POWER PLANT

THISVI COMBINED CYCLE GAS FIRE POWER PLANT

Project Details Location: THISVI GREECE Power Plant Capacity: 435 MW End Customer: ELPEDISON S.A. Client: NOOTER ERIKSEN srl HRSG Boiler Manufacturer: NOOTER ERIKSEN srl Start: 2009 Finish: 2010 Category: ERECTION OF BOILER   Scope of Works Complete mechanical...

THIVA COMBINED CYCLE GAS FIRE POWER PLANT

THIVA COMBINED CYCLE GAS FIRE POWER PLANT

Project Details Location: THIVA GREECE Power Plant Capacity: 435 MW End Customer: HERON THEMROELECTRIC S.A. EPC Contractor: TERNA HRSG Boiler Manufacturer: DOOSAN Gas Turbine Manufacturer: GENERAL ELECTRIC Start: 2008 Finish: 2009 Category: ERECTION OF BOILER/...

OPEN MINES WEST MACEDONIA

OPEN MINES WEST MACEDONIA

Project Details Location: KOZANI/PTOLEMAIS GREECE Owner: P.P.C. S.A. Client: P.P.C. S.A. Start: 2005 Finish: On Going Category: DISMANTLING AND REPLACEMENT OF WARN PARTS OF EXCAVATORS & BELT CONVEYORS   Scope of Works Weekly/Yearly repair works in excavators...