Project Details

Location: DISTOMO/AGIOS NIKOLAOS GREECE
Power Plant Capacity: 444 MW UNIT II
End Customer: MYTILINEOS S.A. GROUP
EPC Contractor: METKA
POWER TRAIN MANUFACTURER: GENERAL ELECTRIC
Start: 2009
Finish: 2010
Category: ERECTION OF STEAM TURBINE/GAS TURBINE & GENERATOR

 

Scope of Works

  • Erection of the gas turbine, the steam turbine and generator on a common axis (Gas Turbine, Steam Turbine & Generator Single Shaft Powertrain) of the Unit
  • Erection of General Electric 9FB Gas Turbine
  • Erection of General Electric A15 Steam turbine and General Electric 450H Generator and auxiliary systems
  • Erection of steam turbine and gas turbine piping

 

Project Photos