Project Details
Location: DISTOMO/AGIOS NIKOLAOS GREECE
Power Plant Capacity: 444 MW UNIT II
End Customer: MYTILINEOS S.A. GROUP
EPC Contractor: METKA
POWER TRAIN MANUFACTURER: GENERAL ELECTRIC
Start: 2009
Finish: 2010
Category: ERECTION OF STEAM TURBINE/GAS TURBINE & GENERATOR
Scope of Works
- Erection of the gas turbine, the steam turbine and generator on a common axis (Gas Turbine, Steam Turbine & Generator Single Shaft Powertrain) of the Unit
- Erection of General Electric 9FB Gas Turbine
- Erection of General Electric A15 Steam turbine and General Electric 450H Generator and auxiliary systems
- Erection of steam turbine and gas turbine piping